Pilot sample deliverable

Utility T&D inspection report: feeder WF-17

Sample output for an Enterprise Proof pilot: severity-ranked asset defects, vegetation risk, map context, and a work-order export that can be routed into GIS or EAM review.

Run summary
Media reviewed3.8 miles / 19 structures
Priority findings3
Exports generatedPDF + GIS pins + CSV

Executive summary

ScanHawk reviewed existing inspection media for feeder WF-17. The AI flagged one critical insulator issue, one high-priority corrosion issue, and one medium vegetation clearance concern. Each finding is tied to structure or span context and prepared for field assignment.

  • Critical issue requires line-maintenance verification before the next high-load window.
  • Corrosion finding is measurable and suitable for trend comparison on the next inspection cycle.
  • Vegetation finding should be routed to the trimming contractor and re-imaged after completion.

Map and location context

GIS-ready
F-1042-01
insulator
F-1044-02
corrosion
F-1045-03
vegetation
Feeder WF-17
3 findings across 3.8 reviewed miles

Severity-ranked findings

Evidence frames and masks would link from each row in production.
idassetspanfindingseverityconfidencemeasurementrecommended action
F-1042-01STR-10421042-1043Suspension insulator damagecritical94%2 chipped bells, flashover staining visibleReplace damaged bell string; field verify during next outage window
F-1044-02STR-10441044-1045Crossarm corrosionhigh91%12.4 sq ft SAM mask areaTreat corrosion, inspect fasteners, schedule follow-up imagery
F-1045-03SPAN 1044-10451044-1045Vegetation encroachmentmedium88%Estimated 8-12 ft clearance risk zoneSchedule trim crew; verify clearance after cut

Work-order export

Download CSV
work orderassetprioritycrewduestatusfinding
WO-7712STR-1042P1Line maintenance7 daysDraftedF-1042-01
WO-7713STR-1044P2Structure maintenance21 daysDraftedF-1044-02
WO-7714SPAN 1044-1045P3Vegetation contractor30 daysDraftedF-1045-03

Pilot proof points

Accuracy review
Compare AI findings against utility ground truth and inspector notes.
Operational fit
Confirm asset IDs, span naming, severity labels, and crew routing match the buyer workflow.
Integration path
Export rows are structured for GIS/EAM mapping before custom API work begins.