Pilot sample deliverable
Utility T&D inspection report: feeder WF-17
Sample output for an Enterprise Proof pilot: severity-ranked asset defects, vegetation risk, map context, and a work-order export that can be routed into GIS or EAM review.
Run summary
Media reviewed3.8 miles / 19 structures
Priority findings3
Exports generatedPDF + GIS pins + CSV
Executive summary
ScanHawk reviewed existing inspection media for feeder WF-17. The AI flagged one critical insulator issue, one high-priority corrosion issue, and one medium vegetation clearance concern. Each finding is tied to structure or span context and prepared for field assignment.
- Critical issue requires line-maintenance verification before the next high-load window.
- Corrosion finding is measurable and suitable for trend comparison on the next inspection cycle.
- Vegetation finding should be routed to the trimming contractor and re-imaged after completion.
Map and location context
F-1042-01
insulator
F-1044-02
corrosion
F-1045-03
vegetation
Feeder WF-17
3 findings across 3.8 reviewed miles
Severity-ranked findings
| id | asset | span | finding | severity | confidence | measurement | recommended action |
|---|---|---|---|---|---|---|---|
| F-1042-01 | STR-1042 | 1042-1043 | Suspension insulator damage | critical | 94% | 2 chipped bells, flashover staining visible | Replace damaged bell string; field verify during next outage window |
| F-1044-02 | STR-1044 | 1044-1045 | Crossarm corrosion | high | 91% | 12.4 sq ft SAM mask area | Treat corrosion, inspect fasteners, schedule follow-up imagery |
| F-1045-03 | SPAN 1044-1045 | 1044-1045 | Vegetation encroachment | medium | 88% | Estimated 8-12 ft clearance risk zone | Schedule trim crew; verify clearance after cut |
Work-order export
| work order | asset | priority | crew | due | status | finding |
|---|---|---|---|---|---|---|
| WO-7712 | STR-1042 | P1 | Line maintenance | 7 days | Drafted | F-1042-01 |
| WO-7713 | STR-1044 | P2 | Structure maintenance | 21 days | Drafted | F-1044-02 |
| WO-7714 | SPAN 1044-1045 | P3 | Vegetation contractor | 30 days | Drafted | F-1045-03 |
Pilot proof points
Accuracy review
Compare AI findings against utility ground truth and inspector notes.
Operational fit
Confirm asset IDs, span naming, severity labels, and crew routing match the buyer workflow.
Integration path
Export rows are structured for GIS/EAM mapping before custom API work begins.